

Project Name: The Dunkin Donut Project
Location: Directly south of the existing Walgreens at the corner of Main Street + Division Street
Proposed By: Lee Fry Companies, Inc.
Date Submitted: May 12, 2014
Status: To be presented at the Plan Commission on May 20, 2014 at 7pm (Village Hall - 24401 West Lockport Street, Plainfield, Illinois).
Let us know what you think about this proposed project.
Comments
Sue - The developer and their consultant team have placed points of entry / exit at Oak Street and Division Street (shared with Walgreens). This is shown more clearly on the site pan (without landscaping) that can be found here: http://www.civicartworks.com/projects/a-vision-for-division/ideas/the-dunkin-donut-project-site-plan-version-2
A Vision for Division
The Dunkin Donut Project: Site Plan w. Landscape Plan (Version 2)

Description:
Project Name: The Dunkin Donut Project
Location: Directly south of the existing Walgreens at the corner of Main Street + Division Street
Proposed By: Lee Fry Companies, Inc.
Date Submitted: May 12, 2014
Status: To be presented at the Plan Commission on May 20, 2014 at 7pm (Village Hall - 24401 West Lockport Street, Plainfield, Illinois).
Let us know what you think about this proposed project.
Related topics:
This image cannot be enlarged. Has the developer changed the access so it is not on Arnold Street?
Sue - The developer and their consultant team have placed points of entry / exit at Oak Street and Division Street (shared with Walgreens). This is shown more clearly on the site pan (without landscaping) that can be found here: http://www.civicartworks.com/projects/a-vision-for-division/ideas/the-dunkin-donut-project-site-plan-version-2
This image cannot be enlarged. Has the developer changed the access so it is not on Arnold Street?